Led a full-scale simulation of a Canadian natural gas dehydration system using Aspen HYSYS and PVTsim. Reduced water content from 113.1 to 7.657 lb/MMSCF, achieving 93.2% removal efficiency to meet Alberta pipeline standards. Optimized TEG-based regeneration efficiency to 96.83%, improving moisture control, thermal stability, and operational reliability.