Hire Me

Design of Canadian Natural Gas Processing Plant

3 months (September 2023 – December 2023)

Led a full-scale simulation of a Canadian natural gas dehydration system using Aspen HYSYS and PVTsim. Reduced water content from 113.1 to 7.657 lb/MMSCF, achieving 93.2% removal efficiency to meet Alberta pipeline standards. Optimized TEG-based regeneration efficiency to 96.83%, improving moisture control, thermal stability, and operational reliability.

Skills Used

  • Aspen HYSYS

  • PVTsim

  • Natural Gas Simulation

  • TEG Dehydration

  • Column Hydraulics

  • Heat Integration

  • Pipeline Standards Compliance